UBC Applied Science Digital Design Studio
Client: University of British Columbia
Consultant: Kinetic Construction Ltd.
Prime Contractor: Kinetic Construction Ltd.
Location: Vancouver, BC
Completion: 2025
Project Scope:
-
Erosion and sediment control measures
-
Site stripping, grading, and earthworks
-
Slab-on-grade preparation and granular base installation
-
Mechanical trenching for storm and sanitary services
-
Electrical trenching and service works
-
Generator pad preparation and site servicing elements
-
Installation of site features including bollards
The UBC Applied Science Digital Design Studio project involves comprehensive site services and civil works to support a new academic facility within the University of British Columbia campus. Neil Smith Construction Ltd. is delivering a range of earthworks, excavation, trenching, and site preparation activities in accordance with UBC Technical Guidelines and sustainability requirements.
The scope includes erosion and sediment control, slab-on-grade preparation, footing excavation, mechanical and electrical trenching, and detailed backfill and compaction. All work is executed within a highly active institutional environment, requiring careful coordination with multiple disciplines and strict adherence to safety, quality, and environmental standards.
As part of a LEED-compliant project, sustainability considerations are integrated into construction practices, including responsible material use, erosion control, and documentation supporting sustainable design objectives.
Neil Smith Construction Ltd. brings extensive experience in delivering complex civil scopes on institutional campuses. Through detailed planning, disciplined execution, and close collaboration with consultants and university stakeholders, the project is progressing efficiently while meeting the University’s technical, environmental, and operational requirements.