George Greenaway Elementary Addition
Client: Unitech Construction Management Ltd.
Prime Contractor: Unitech
Location: Surrey, BC
Completion: Ongoing
Project Scope
-
Excavation, handling, and disposal of contaminated soils in compliance with environmental regulations
-
Detailed excavation and shoring for underground structures and utilities
-
Bulk excavation and backfilling to design grades, including placement of engineered fill
-
Trenching and detailed excavation for underground utility installation
-
Coordination with environmental consultants to ensure proper soil classification and disposal tracking
-
Site grading and preparation for future surface works
Located in Surrey, the Greenaway project centered on extensive excavation and the safe handling of contaminated soils. The scope required detailed excavation, shoring, and backfilling to prepare the site for future civil works while ensuring compliance with strict environmental regulations.
Because soil contamination was a significant component of this project, our team worked closely with environmental consultants to classify, track, and dispose of materials properly. Careful coordination and planning were essential to minimize risks, maintain safety, and ensure regulatory compliance throughout the process.
In addition to contaminated soil removal, we carried out bulk excavation, trenching for underground utilities, and site grading to achieve the design elevations. With detailed oversight and daily site management, the project was delivered cleanly, efficiently, and with full attention to community and environmental standards.