Agnes Street Development
Client: Keller Construction Ltd.
Prime Contractor: Keller Construction Ltd.
Location: New Westminster, BC
Completion: Ongoing
Project Scope
-
Clearing and grubbing with off-site disposal
-
Installation and maintenance of erosion and sediment control measures
-
Shoring excavation in accordance with engineered shoring design
-
Bulk and detailed excavation, backfill, and compaction
-
Storm retention tank excavation and backfill
-
Retaining wall excavation and structural backfill
-
Import and placement of structural fill per geotechnical requirements
-
Temporary access roads and excavation ramps
-
Rough grading to ±50 mm tolerance
-
Protection and capping of existing utilities
-
Dust control and environmental compliance
-
Utility locates and coordination within municipal right-of-way
The 602 Agnes Street project is located in a tight urban setting in downtown New Westminster, requiring careful planning, sequencing, and coordination to safely execute excavation and shoring works.
Neil Smith Construction Ltd. is responsible for managing all excavation activities while maintaining site safety, protecting adjacent properties, and complying with municipal, environmental, and geotechnical requirements. Due to the constrained site conditions, shoring installation, access management, and excavation staging are critical to the success of the project.
All work is performed in close coordination with the prime contractor, consultants, and inspectors to ensure construction progresses efficiently and safely.
Project Gallery